Engineers conduct floating bridge operations at Camp Ripley
Sgt. Warren Pedersen, a bridge builder crewmember and non-commissioned officer in charge with the Army Reserve 652nd Engineer Company, 397th Engineer Battalion, directs an M2 Bradley onto the improved ribbon bridge (IRB) at Camp Ripley, Minnesota, July 16, 2022. Each bridge component of an IRB weighs approximately 13,000 pounds and once assembled, the IRB can support loads weighing more than 70 tons. (U.S. Army photo by Spc. Elizabeth Hackbarth, 364th Theater Public Affairs Support Element)