YEAR IN PHOTOS 2023

SHOWCASING THE MULTITUDE OF EXPERIENCES OF ARMY RESERVE SOLDIERS OVER THE PAST YEAR
AND HIGHLIGHTING THE PHOTOGRAPHY OF PUBLIC AFFAIRS PROFESSIONALS. 

 

 

 

 

 

 

411th Engineer Company equipment deployment by rail movement at Fort McCoy
Railcars that were loaded by Soldiers with the Army Reserve’s 411th Engineer Company with military vehicles and equipment are shown Nov. 17, 2022, at Fort McCoy, Wis. Overall the company loaded 128 items on to railcars over the multi-day rail movement at the installation to deploy the equipment eventually to the U.S. Central Command area of responsibility. Five personnel with the Fort McCoy Logistics Readiness Center (LRC) assisted with the rail movement and its coordination. The 411th is the latest of many units over the last decade to hold rail movements at Fort McCoy. As a matter of fact, for the many decades of Fort McCoy’s existence, the capability to transport cargo and equipment to and from the installation by rail has always been there. And it’s a capability that will continue, Fort McCoy LRC officials said. During World War II, for example, the railroad at Fort McCoy was one of the main forms of transportation for bringing troops in for training and home after the war as well as for moving cargo and equipment in and out of the installation. The 411th is headquartered in Cedar Rapids, Iowa.

Photo by: Scott T. Sturkol |  VIRIN: 221117-A-OK556-995.JPG